Compaq HSZ80 Przewodnik Instalacji Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 28
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
Service Guide
EK-HSG80-UP. B01 Page 19
12.0 Upgrading the Server
Use the following steps to upgrade the server components:
1. Power-on and bootstrap the host.
2. Install the host adapter drivers according to operating system specific Installation Reference
Guide.
3. Reconfigure the kernel or reboot if necessary.
4. Once the operating system has been bootstrapped, ensure that the Command Console LUN
has been located and configured on the UNIX Servers.
SGI IRIX # inv v
HP-UNIX # ioscan nf
SUN Solaris # format e
Tru64 # file /dev/rrz*c
IBM AIX # lsdev Cc disk
5. Recreate the device special file or drive letter for the CCL, if necessary for your server
operating system.
6. Install the Version 8.3 SWCC Agent according to the instructions in the specific Installation
Reference Guide for your operating system.
7. Restore the ~steam/etc/client.ini file if it was saved in a previous step. A restart of the Agent
is required if the client.ini was restored from a backup file or any time that the configuration
files are changed.
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 27 28

Komentarze do niniejszej Instrukcji

Brak uwag