Compaq StorageWorks 1000 - Modular Smart Array Dokumentacja Strona 39

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 102
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 38
Operation and Management
39MSA1000 Reference Guide
Applying Power
Before applying power to the MSA1000, all components of the storage system
must be installed and connected to the supported interconnect options. Hard
drives should be installed in the MSA1000 so that they can be identified and
configured at power up.
The MSA1000 components should be powered up in the following sequence:
1. Storage Expansion Enclosures
2. MSA1000
Power on the MSA1000 using the switch located in the far-right lower area of
the front panel of the MSA1000. After powering on, wait until the message
MSA1000 Startup Complete” appears on your display. This process may
take up to two minutes.
3. Interconnect Devices
4. Server(s)
Przeglądanie stron 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 101 102

Komentarze do niniejszej Instrukcji

Brak uwag